BBC STUDIOS – CARDIFF

Client
ISG PLC

Services Provided
Bulk Excavation, Contaminated Land, Disposal, Import of Recycled Crushed 6F2, Installation of Piling Mat, Installation of Temporary Vehicular Access Ramps.

Duration
3 months

Value Range
Over £2-2.5 million

Key Stats
– 99,000T of earth moved in 11 weeks
– Frequency of loads peaked at 144 loads per day. (A FULL wagon loaded and off site every 4 minutes!!)
– Import of 13,000T of crushed 6F2 for piling mat and temporary ramps
– Installation of 7,500m2 of teram and piling mat